Central Valley Cold Storage

Challenge

This refrigerated storage and logistics warehouse was experiencing high energy bills and had difficulty maintaining temperature on hot days in the San Joaquin Valley. At the same time the existing built up roof had reached the end of its useful life causing water and vapor leaks.

Solution

CCC installed a new sprayed polyurethane foam roof system with a vapor barrier coating. This stopped the leaks and increased the roof insulation providing substantial energy savings.