Castilleja School – Campus Center & Rhodes Hall

Challenge

The existing 1960’s era classroom and administration buildings were in need of a new roof and the lack of existing insulation led to classrooms which were nearly impossible to heat and cool to a comfortable level. Beyond providing a roofing and insulation solution, the new roof needed to maintain the aesthetic of the existing volcanic rock roofs while meeting the CalGreen Code requirement needed in Palo Alto.

Solution

CCC installed a Spray Foam roof providing R-30 insulation. Instead of the standard white topcoat and granules, CCC installed a custom color, “Spicy Hue” to match the existing aesthetic.